www.u83c92.cn-国产成人AV在线影院,亚洲欧洲一区二区三区久久,亚洲天堂网20211080P,亚洲精品色婷婷在线影院

  • <ul id="uccks"></ul>
    
    <dfn id="uccks"></dfn>
    <strike id="uccks"><td id="uccks"></td></strike>
    <dfn id="uccks"></dfn>
  • <strike id="uccks"><rt id="uccks"></rt></strike>

    Language:CHINESESENGLISH

    Homepage > Product > steel villa
    Contact Us
    • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
    • Phone:0757-81002668/0757-63323396
    • Fax:0757-81196682
    • Contact:梁先生/Mr Leung
    • Phone:18900873383/18900873268
    • E-mail:sbs@sbsprefabhouse.com
    • Skype: sbs-Candy
    • URL:http://www.u83c92.cn

    steel villa

    steel villa

     

     

     steel villa

    1.STEEL STRUCTURE VILLA
    Steel structure villa industrial production using a combination of standard components, it has many advantages: flexible design, cost control, construction period is short, fast and convenient way to pay, environmental protection, good shock resistance, safer, more flexible, more savings energy. Steel structure villa widely built in tourist attractions, the seaside resort around the house or other purposes. If you want to understand the benefits of more steel structure villa, please contact us, we will answer your questions in detail.

     

     

     

    2.Steel Structure Panel material
    The steel structure panel material included EPS sandwich panel,Rock wool sandwich panel,PU sandwich panel,fiber-glass ,steel sheet.

    Steel structure panel material: including wall panel and roof panel
    Sandwich core materials: EPS, PU, rock wool, glass wool
    Thickness of sandwich panels: 50mm, 75mm, 100mm, 150mm
    Single color plate material thickness: 0.376mm, 0.426mm, 0.476mm

     

     

    3.Product details

    Product Name

    Prefabricated Steel Structure Villa

    Specification

    Foundation

    Concrete and Steel

    Support

    X or V types, angle steel or round tube

    Surface

    Two layers and anti-rust paint

    Color

    White, Grey, Blue, Green, etc

    size

    Designed by your requirement

    Advantages

    1. Stable Construction
    2. Anti-seismic performance
    3. Aesthetic appearance
    4. Short construction period
    5. High-speed installation
    6. Life span durability
    7. Environmental-Friendly product
    8. Energy saving

    Main component

    Base materials

    Cement and steel foundation bolts

    Main frame

    H beam (welded or hot rolled)

    Material

    Q35B,Q345B

    Purlin

    C purlin (C120-320) or Z Purlin (Z100-200)

    Bracing

    Tie bar, lateral bracing, column bracing, knee bracing, etc

    Bolt

    Normal bolt, high strength bolts, Galvanized bolt

    Roof & wall

    Sandwich panel, steel corrugated sheet

    Door

    Sliding door , rolling shutter

    Window

    PVC window, aluminum-alloy Window

    Accessories

    Skylight, ventilation, downpipe and galvanized gutter etc .

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

    4.Steel structure design common norms are as follows:


    "Cold-formed steel structure technical specifications" (GB50018-2002)
    "Construction Quality Acceptance of Steel" (GB50205-2001)
    "Technical Specification for welded steel structure" (JGJ81-2002, J218-2002)
    "Technical Specification for Steel Structures of Tall Buildings" (JGJ99-98)

     

     

     

    5.Guidance installation
    Shengbang Steel Structure Company can supply the guidance installation service.Usually steel structure building is a large installation engineering. If customers may need the professional technical engineer to supervise the installation on site overseas, the customer must to inform before 1 months from leave the China . But customer should coordinate with us for following aspects:
    Customer should provide:
    1) Translator or assistant on site.
    2.)All costs raised including:
    A. visa fee
    B. Round trip flight ticket
    C. Accident insurance for the supervisor during the period
    D. Accommodation
    E. Daily meals
    F. Internet
    G. Local traffic fee (if any)
    3) The customer should pay the engineer with supervision fee, which can be negotiated and decided by both.
    4)Customer has the responsibility to provide necessary security system to protect the supervisor, especially in some unrest countries.
    There have some guidance installation picture:

     

     

    Contact way

    1)FOSHAN SHENGBANG STEEL STRUCTURE CO., LTD
    2)Add:Pingtang Industrial Park, Shipeng Village, Shishan Town, Nanhai District,
    3)Foshan, Guangdong Province, China
    4)Tel:0086-757-63323396/0086-757-18900873268 Fax:0086-757-81196682

    Hits:8461 Time:[2020-8-30]

    Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
    精品国产一区二区三区久久| 精品一区二区三区免费播放| 欧美日韩高清一区二区三区视频| 精品亚洲成a人在线| 久久资源婷婷五月| 中文字幕在线播放| 成全视频观看高清在线观看| 一本大道久久a久久精品综合1| 欧美无砖专区一中文字| 亚洲成AV人片在线观看WWW|