www.u83c92.cn-国产成人AV在线影院,亚洲欧洲一区二区三区久久,亚洲天堂网20211080P,亚洲精品色婷婷在线影院

  • <ul id="uccks"></ul>
    
    <dfn id="uccks"></dfn>
    <strike id="uccks"><td id="uccks"></td></strike>
    <dfn id="uccks"></dfn>
  • <strike id="uccks"><rt id="uccks"></rt></strike>

    Language:CHINESESENGLISH

    Home > News > Steel installation quality assurance technical measures
    CONTACT US
    • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
    • Phone:0757-81002668/0757-63323396
    • Fax:0757-81196682
    • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
    • E-mail:sbs@sbsprefabhouse.com
    • URL:http://www.u83c92.cn

    Steel installation quality assurance technical measures

    Time:[2021-2-25]  Hits:2022

    Guangzhou Steel Construction site quality management should be the appropriate technical standards, quality management system, quality control and inspection system, construction construction site due approval by the project technical director of design, construction scheme and other technical documents. Ago installation of steel structures, with careful design unit tests, mechanical mode clear steel system, construction loads, the structure to withstand dynamic loading and fatigue requirements, the technical preparations to ensure the structural safety.

    Guangzhou Steel construction must go through metrological verification, calibration of measuring instruments qualified.

    Familiar with the installation site of the surrounding environment, establish a reasonable measurement control network, preparing to meet the measurement requirements of the scheme member spatial orientation. Lifting the preparation program.

    Contact with supervision units, the special construction process tests, or entrust qualified detecting unit, including soldering or welding procedure qualification test, the detection of high strength bolts or anti-slip coefficient retest, and other large equipment safety testing of the relationship between the structural safety of the process.

    Steel engineering construction quality acceptance should be based on self-test unit, according to the inspection lot, sub-project program, subpart will be.

     

    Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
    精品熟女少妇aⅴ免费久久| 蜜芽五月国产全黄a一级毛片| 最美情侣中文在线电影资源| 亚洲系列国产精品制服丝袜第| 成品直播大全免费观看| 免费一级欧美片在线观看欧美| 国产精品永久久久久久久久久| 亚洲国产一区二区三区直接播放心得| 性欧美丰满的P| 少妇特殊按摩高潮惨叫无码|