www.u83c92.cn-国产成人AV在线影院,亚洲欧洲一区二区三区久久,亚洲天堂网20211080P,亚洲精品色婷婷在线影院

  • <ul id="uccks"></ul>
    
    <dfn id="uccks"></dfn>
    <strike id="uccks"><td id="uccks"></td></strike>
    <dfn id="uccks"></dfn>
  • <strike id="uccks"><rt id="uccks"></rt></strike>

    Language:CHINESESENGLISH

    Home > News > Foshan main steel members (b)
    CONTACT US
    • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
    • Phone:0757-81002668/0757-63323396
    • Fax:0757-81196682
    • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
    • E-mail:sbs@sbsprefabhouse.com
    • URL:http://www.u83c92.cn

    Foshan main steel members (b)

    Time:[2016-5-14]  Hits:4289

    welding
    (1), the general requirements
    a welder required certificates.
    c welding, flux before use technical specifications shall be specified baking temperature baking.
    c welding welder should be reviewed before the handling member joint quality and pads, if not meet the requirements, in order to be qualified welding after trimming.
    (2) the welding process
    a Before welding, construction workers assessed according to the process of compilation of the welding process instructions, specific guidance welder welding work.
    b raining or snowing non-open-air welding.
    c positioning welders should have Welder certification, welding materials used should tack welding and welding materials the same official, tack welding may not have pores, cracks, slag and other defects.
    d same position should not exceed twice the number of weld repair.
    (3), H-beam welding
    All members of the project H-beam welding using LMZ-1500 automatic gantry welding machine, automatic submerged arc welding, gas shielded welding machine welding, to avoid weld, slag, weld defects.


    test
    (1) After completion of the processing member, in accordance with the processing map and (GB50205-2001) of the relevant provisions into acceptance.
    (2), member acceptance criteria for the acceptance of construction quality of steel structures (GB50205-2001) and construction drawings.

    Painting, NO
    (1), the general requirements
    a member rust and paint work should be carried out after the quality inspection qualified member.
    b Painting Lobe coating construction personnel professional training, after familiar with the performance of coatings and coating job essentials, before construction.
    (2), the management coatings
    A variety of coating materials of different specifications should meet the design requirements.
    b component coating technology used must comply with the conditions of professional standards, and product certification. Over use of custody of the paint should be re-inspection, qualified before use.

    Factory
    Lifting member according to plan will be qualified batches packaged, transported to the site.

    Admission preparation
    (1), construction workers and related personnel arrived at the construction site preparation work before installation.
    (2), the former construction workers were entering education, quality, duration, safety and other aspects of the work to fully implement the team, for all the difficulties of design drawings, construction program, focusing on a comprehensive understanding.
    (3), with the Party-site tests, such as raw materials, components, and equipment disposal site access road, water, electricity, housing, construction coordination and determine the amount of each process and construction plans, and other construction units Cross Operations Coordination plan.
    (4) of the construction process (base buried and associated facilities) for review, to ensure the quality of embedded parts, elevation, the central axis, geometry, parallel degree correct. Do the handover procedures.
    (5), according to the requirements of the steel works, ready to upgrade machinery, equipment, tools, materials planning and special tools; equipment to do the preparatory work and auxiliary materials, such as cranes, welding machines, measuring instruments, hand tools and other aids , implement vertical transport conditions.
    (6), inspection and acceptance steel components positioning axis, elevation, and make the steel member installation guides actinomycetes work;
    (7), is responsible for the installation of steel components transport lifting, positioning, calibration, fastening bolt, seam welding installation work;
    (8), according to the actual situation of the construction work planned to make necessary adjustments and additions and submitted to the project manager for approval.

    Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
    亚洲精品国产精品乱码视色| 亚洲一区二区三区在线视频| 插曲免费的视频大全影视| 国产精品亚洲二区在线观看| 免费播看高清大片免播放器一| 国产动作大片中文字幕| 少妇特殊按摩高潮惨叫无码| 91一区欧美精品第三页| 亚洲中文无码a∨在线观看| 国产亚洲欧美精品手机在线|