www.u83c92.cn-国产成人AV在线影院,亚洲欧洲一区二区三区久久,亚洲天堂网20211080P,亚洲精品色婷婷在线影院

  • <ul id="uccks"></ul>
    
    <dfn id="uccks"></dfn>
    <strike id="uccks"><td id="uccks"></td></strike>
    <dfn id="uccks"></dfn>
  • <strike id="uccks"><rt id="uccks"></rt></strike>

    Language:CHINESESENGLISH

    Home > News > Guangzhou Steel welding inspection
    CONTACT US
    • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
    • Phone:0757-81002668/0757-63323396
    • Fax:0757-81196682
    • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
    • E-mail:sbs@sbsprefabhouse.com
    • URL:http://www.u83c92.cn

    Guangzhou Steel welding inspection

    Time:[2016-3-19]  Hits:3690

    Guangzhou Steel welding inspection

    1. General Guangzhou Steel Structure

    (1) Welding Inspection Category

    1) self-test, the construction unit in the manufacturing, installation, Guangzhou steel unit with corresponding qualifications of inspectors or inspection agencies entrusted with the corresponding qualification tests carried out;

    2) supervisory inspection, the owner or his representative commissioned an independent third party inspection and testing organization with the corresponding qualification test performed;

    General Procedure 3) welding inspection, including inspection before welding, after welding inspection and welding inspection, and shall comply with the relevant regulations.

    2. visual inspection of weld

    Visual inspection can be carried out (1) All welds shall be cooled to ambient temperature.

    (2) visual inspection by visual way.

    3. The structure of the welding quality to withstand static load test

    The appearance quality of the weld should regulatory requirements. Weld size shall comply with the regulatory requirements.

    Basic requirements (1) non-destructive testing

    Non-destructive testing shall be carried out after the appearance of qualified testing.

    (2) design requirements of the full penetration welds, test internal defects

    1) a weld should be 100% inspection.

    2) two welds should be carried out sample testing, checking ratio of not less than 20%.

    3) three weld testing should be carried out according to the relevant design requirements, in general, may be non-destructive testing.

    (3) ultrasonic testing regulations

    When the ultrasonic detection result of doubt, can be used to verify ray detector.

    (4) Surface inspection provisions

    Ferromagnetic materials should be used to detect magnetic surface imperfections. When not using the magnetic particle testing, penetrant testing should be used.

    Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
    伊人久久大线蕉91| 中文无码熟妇人妻av在线| 亚洲国产日韩精品一区二区| 色婷婷久久综合中文久久一| 最近免费中文字幕大全免费版视频| 国产激情久久久久影院小草| 三年高清视频大全| 97AV麻豆蜜桃一区二区| 97国产精华最好| 国产3级在线观看|