www.u83c92.cn-国产成人AV在线影院,亚洲欧洲一区二区三区久久,亚洲天堂网20211080P,亚洲精品色婷婷在线影院

  • <ul id="uccks"></ul>
    
    <dfn id="uccks"></dfn>
    <strike id="uccks"><td id="uccks"></td></strike>
    <dfn id="uccks"></dfn>
  • <strike id="uccks"><rt id="uccks"></rt></strike>

    Language:CHINESESENGLISH

    Home > News > construction steel structure fire regulations
    CONTACT US
    • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
    • Phone:0757-81002668/0757-63323396
    • Fax:0757-81196682
    • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
    • E-mail:sbs@sbsprefabhouse.com
    • URL:http://www.u83c92.cn

    construction steel structure fire regulations

    Time:[2016-1-27]  Hits:3969

    Guangzhou Steel tells you: construction steel structure fire regulations


    1. Guangzhou fireproof coating protected by trained and qualified construction professional construction team. Construction of security technology and labor protection requirements, should be the existing relevant provisions of the state.
    2. When the steel structure in place, the boom connected thereto, a horse track, pipe racks and other related components even installed, and after passing the acceptance, before proceeding fireproof coating.
    3. Before construction, steel surfaces should be rust, and determine in accordance with the requirements of anti-rust treatment. Rust and rust treatment should comply with "Steel Construction and acceptance norms" in the relevant provisions.
    4. steel surface debris should be cleaned, cracks or other fire use fire-resistant coating material which is connected at the block level before construction fill.
    5. fire retardant coating construction should be carried out before the next interior decoration and are not damaged by the subsequent engineering conditions. When construction on the site and other objects need for fire protection shielding should be protected, just construction coating should prevent dirty fluid contamination and mechanical shocks.
    6. Before the construction process and the coating is dried and solidified, the ambient temperature should be maintained at 5 ~ 38 ℃, relative humidity not more than 90%, the air should circulate. When the wind speed is greater than 5m / s, or rain and member surface condensation, not a job.

    Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
    国产欧美国产综合每日更新| 久久99国产精品成人| 亚洲AV无码一区二区三区dv| 性少妇videosexfreexxxx片| 久久资源婷婷五月| 国产AV天堂一区二区三区。| 精品国产AV最大网页| 日本亚洲色大成网站WWw| 一本一本久久a久久精品综合麻豆| 星空视频在线观看免费播放电影|